skip to main |
skip to sidebar
Some of the "during" loft pictures.
Here is what we are doing in the loft: Fixing framing and drywalling the whole thing, putting a new floor in including a sub-floor, installing new windows, moving the ceiling fan box and adding two ceiling fixture boxes. Think that's it. Oh, and painting the railing and steps, which of course I started and have to finish once Dave is done.